Planned Maintenance - Datacenter UPS Infrastructure at Piermark Drive

Scheduled Maintenance Report for Voyager

Completed

The scheduled maintenance has been completed.
Posted May 27, 2026 - 17:32 NZST

Verifying

Verifying that all aspects of service is functional.
Symptoms: Potential for brief loss of connectivity to devices/services on the UPS-A feed.

During the battery replacement, UPS-A will operate without battery backup. In the unlikely event of a mains failure, some single-PSU devices may lose power until the generator auto-starts and the ATS completes transfer (typically 10–15 seconds), or mains is restored.

UPS-B and all equipment on the UPS-B feed are unaffected.
Posted May 27, 2026 - 16:10 NZST

Update

Maintenance in progress.
Symptoms: Potential for brief loss of connectivity to devices/services on the UPS-A feed.

During the battery replacement, UPS-A will operate without battery backup. In the unlikely event of a mains failure, some single-PSU devices may lose power until the generator auto-starts and the ATS completes transfer (typically 10–15 seconds), or mains is restored.

UPS-B and all equipment on the UPS-B feed are unaffected.
Posted May 27, 2026 - 09:19 NZST

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 27, 2026 - 09:00 NZST

Scheduled

Maintenance has been scheduled.
Symptoms: Potential for brief loss of connectivity to devices/services on the UPS-A feed.

During the battery replacement, UPS-A will operate without battery backup. In the unlikely event of a mains failure, some single-PSU devices may lose power until the generator auto-starts and the ATS completes transfer (typically 10–15 seconds), or mains is restored.

UPS-B and all equipment on the UPS-B feed are unaffected.
Posted May 21, 2026 - 13:24 NZST
This scheduled maintenance affected: Managed Services (Datacenters).